A post-war prefab is a small, factory-made, single-storey house built quickly after the Second World War to replace bombed or lost homes. They were designed to last about ten years, but a few survive today.
Prefabs were built under the Temporary Housing Programme from 1944, using steel, aluminium, concrete and asbestos-cement panels made in factories and assembled on site. Many had a fitted kitchen, a bathroom and a garden, which tenants often loved.
1944-1955
The band covers the early part of the post-war period. Periods are drawn at equal width, so the line is not to scale.
How to recognise it
| Feature | What to look for |
|---|---|
| Size | A small single-storey house, with two bedrooms, a living room, a kitchen and a bathroom. |
| Structure | A steel, timber or aluminium frame with factory-made panels, built on a concrete slab. |
| Walls | Flat panels of asbestos-cement, steel or timber, with visible joints and a painted finish. |
| Roof | A shallow-pitched roof, often covered in corrugated asbestos-cement or felt, with a small chimney. |
| Windows | Metal or timber casement windows with a few glazing bars. |
| Kitchen | A compact factory-made kitchen with built-in units, new for many tenants. |
| Types | Several types, including Uni-Seco, Arcon, AIROH and Tarran, each with a slightly different look. |
Not sure what a term means? See our guides to sash and casement windows and parts of a roof, or browse the full architectural glossary.
Where and when they were built
The Temporary Housing Programme was set up in 1944 to deal with the shortage of homes. Prefabs were cheap and quick to build, and were often put up in rows on bomb sites and open land.
The Historic England list entry for six Uni-Seco prefabricated houses on the Excalibur Estate in Catford, Grade II, describes the estate as the largest surviving estate of prefabs in England. The entry describes the houses as dated 1945 to 1946 and notes the mix of Mark 2 and Mark 3 types.
Prefab, council housing or system-built?
- Post-war prefab: 1944 to 1955. A temporary factory-made bungalow, designed to last about ten years.
- Post-war council housing: permanent brick houses and flats. See our post-war council housing page.
- System-built housing: larger concrete panel schemes from the 1960s. See our system-built page.
- Council cottage estates: the interwar traditional equivalent. See our council cottage estates page.
Very few prefabs are still lived in, and those that survive are often listed or in protected areas. Many are now rare and valued.
What to check when buying one
- Asbestos: many prefabs used asbestos-cement panels and roofing. Do not drill, cut or break them. Get specialist advice.
- Frame and panels: steel frames can rust and timber frames can rot. Look for damage around the base of the walls.
- Mortgage: some lenders will not lend on non-traditional construction. Check before you offer.
- Heat and condensation: thin walls and old roofs lose heat and suffer from condensation. See our damp and mould guide.
- Repairs and replacement parts: parts for prefab designs are hard to find, so repairs often need a specialist.
- Choose the right survey: use a surveyor who knows post-war construction, because the problems are different from those of older houses. See our home survey guide.
- Mortgage and insurance: some post-war construction types are harder to mortgage or insure. Check with a lender and insurer before you commit.
Sources and further reading
- Historic England: Excalibur Estate, Catford Six Grade II listed Uni-Seco prefabricated houses of 1945 to 1946
- Historic England: Domestic 4, Modern Houses and Housing Listing selection guide covering 20th-century houses and housing
- Historic England: the National Heritage List for England Check whether a building is listed
External links open in a new tab. Last checked November 2026.
Frequently asked questions
What is a prefab house?
A house made from factory-built sections and assembled on site. Post-war prefabs were small single-storey bungalows built between 1944 and 1955.
How long were prefabs meant to last?
About ten years, although many lasted far longer.
Do any prefabs survive?
Yes, a few. The Excalibur Estate in Catford is the largest surviving estate of prefabs in England.
Do prefabs contain asbestos?
Many did, in the wall panels or roofing. Treat any suspect material with care and get a specialist to check it.
Are prefabs listed?
Some are. For example, six Uni-Seco prefabs on the Excalibur Estate in Catford are listed Grade II.