50+ Specialist Calculators
Instant Results - No Sign-Up
Free to Use
Professional tools for serious builders

How much screed do I need for a floor?

Multiply the floor area by the screed depth to get the volume. A 75 mm sand and cement screed over a 25 m² floor requires 25 x 0.075 = 1.875 m³ of screed material. A standard 1:3.5 cement-to-sharp-sand mix yields approximately 1.65 m³ per tonne of cement when mixed. Minimum screed depths under UK guidance are 65-75 mm for unbonded screeds, 40-50 mm for bonded screeds, and 25-40 mm for liquid screeds - depths depend on the screed type, whether underfloor heating pipes are embedded, and the final floor covering. UK Building Regulations Part L requires the screed layer above underfloor heating to be thermally efficient and to achieve the required floor U-value.

Concrete Screed Calculator

Add each area, choose your screed type and thickness, and get volumes, materials and drying times

Metric (m) Imperial (ft / in)

Areas

Unbonded on insulation: 65-75mm • Bonded to concrete: 25-40mm • UFH: min 65mm over pipes
5%
Allow 5-10% for uneven sub-floors and mixing losses

Job Costing

Enter costs in your local currency.

UK Market PricesFills in the material cost fields with current UK market prices. You can review and edit each price before applying.

Results

Total Area
-
Screed Volume
-
Cement Bags
-
x 25kg bags
Sand
-
tonnes

Estimated Drying / Curing Times

-
Walk on
-
Light use / tiling
-
Full cure / floor covering

Drying times are estimates only and depend on temperature, humidity and ventilation. Always check with your screed supplier.

Area Breakdown

Area Floor Area Volume Cement Bags Sand (t)

🚫 Estimate waste & skip size for this project →

Doing this as a homeowner?
Who do you actually need to hire for this?
Who do I need?
Not sure what some of these terms mean?
Browse all →
Screed Datum Level Vapour Barrier Oversite Ground Bearing Slab Blinding Damp Proof Membrane Thermal Bridging Hardcore U Value Pir Insulation Interstitial Condensation Strip Foundation Raft Foundation Foundation Tile Adhesive Grout Skirting Board Condensation

Frequently Asked Questions

How much screed do I need per square metre?
Multiply floor area by screed depth. A 75 mm screed over 25 m²: 25 x 0.075 = 1.875 m³. Sand-cement screed weighs approximately 2,000 kg/m³. A standard 1:3.5 mix uses approximately 350 kg cement + 1,200 kg sharp sand per m³. The calculator above gives exact quantities and bag counts.
What is the minimum screed depth?
Bonded screed (keyed to slab): minimum 25-40 mm. Unbonded screed (over polythene sheet): minimum 50-65 mm. Floating screed (over insulation): minimum 65-75 mm. Liquid screed (calcium sulphate): minimum 25-35 mm. Over UFH pipes: minimum 25-30 mm cover for sand-cement, 20-25 mm for liquid screed.
What is the difference between sand-cement screed and liquid screed?
Sand-cement screed: traditional semi-dry or wet mix, trowelled by hand, walkable in 24-48 hours, ready for floor coverings after ~4 weeks (1 day per mm). Liquid screed (calcium sulphate): pumpable, self-levelling, flatter finish, better for UFH, but requires 6-8 weeks drying time before floor coverings.
How long does screed take to dry before tiling or floor coverings?
Sand-cement screed: approximately 1 day per mm thickness (75 mm = ~75 days fully dry). Liquid screed: typically 6-8 weeks. Before tiling: screed must be below 75% RH. Before wood or carpet: below 65% RH. Always test with a hygrometer - do not rely on time estimates alone.
What Building Regulations apply to floor screeds?
Part A for loadbearing applications. Part L when used above insulation - ground floor maximum U-value 0.25 W/m²K in England. UFH systems must be designed to BS EN 1264 for efficient heat distribution. Part C requires waterproofing of screed in wet areas before tiling.
Can I screed over underfloor heating pipes?
Yes - standard method for in-screed UFH. Pipes are secured to insulation before screeding. Minimum cover above pipes: 25-30 mm (sand-cement) or 20-25 mm (liquid screed). Pressure-test pipes before screeding. Wait 28 days (sand-cement) for full strength before commissioning heating, then bring up to temperature gradually over several days.