Solar PV Guide for UK Homes

Costs, roof suitability, batteries, export payments, planning and grid connection, explained plainly.

Home›Renewables Guide›Solar PV
Figures and rules last verified October 2026. They change, so check the sources linked on this page.
Quick answer

A typical 4kWp solar PV system costs roughly £5,500 to £8,000 installed in the UK in 2026. It suits most roofs that face east, south or west with little shade. You are paid for exported power through a Smart Export Guarantee tariff, which needs an MCS-certified system up to 50kW.

Most pitched-roof systems are permitted development in England, but the rules were amended on 27 August 2026 and conditions still apply, particularly for listed buildings and conservation areas.

How solar PV works

Solar photovoltaic (PV) panels turn daylight into direct current electricity. An inverter converts it to the alternating current your home uses. What you generate is used first in the house, any surplus is exported to the grid, and a battery can store some of the surplus for the evening.

System size is quoted in kilowatts peak (kWp). A 4kWp system is typically around 9 to 10 panels and suits many three-bedroom homes. Output depends on orientation, pitch, shading and location. See MCS for how systems are certified.

Is your roof suitable?

Sizing a system

Size to your usage and roof space, not to the biggest system that fits. A larger array costs less per kWp but exports more of its output at a lower export rate. Use our Solar PV Calculator for an initial estimate, then ask installers to model your actual usage.

What does solar PV cost?

ItemIndicative installed cost (2026)
4kWp systemAbout £5,500 to £8,000 (roughly £1,400 to £2,000 per kWp)
Government and MCS dataMedian figures for a 4kW system have been reported at about £7,500
Battery (5 to 13kWh)About £4,000 to £9,000 installed, if added at the same time
Scaffold, if separateOften several hundred pounds, depending on the house

These are ranges from MCS and DESNZ-derived data and installer price guides, which do not all agree. Quotes vary by roof, panel and inverter choice, and region. Treat any figure as a starting point for comparing quotes.

Savings and payback

The Ofgem price cap averages about 26.3p per kWh for electricity from October to December 2026. Every kWh you use from your own panels avoids that cost, while exported kWh earn only the export rate. Self-consumption is therefore worth far more than export.

A simple payback is the installed cost divided by the yearly saving plus export income. Payback varies widely with system size, how much you use during the day and your tariff, so work it through with your own usage rather than relying on a headline number.

Batteries

For a full breakdown, see our battery storage guide. Charging an electric car from solar is covered in the EV charging guide.

A battery stores surplus generation for use later, raising your self-consumption. Reported installed prices run from roughly £4,000 to £9,000 depending on capacity and brand, and simple payback is often quoted at 10 years or more unless you use time-of-use tariffs. Batteries tend to make most sense for households that are out in the day and use most power in the evening. Standalone home battery installs are currently zero-rated for VAT until 31 March 2027, after which the 5% reduced rate is due to apply unless the relief is extended.

Getting paid for exports: the Smart Export Guarantee

The Smart Export Guarantee (SEG) requires larger suppliers to offer a tariff for exported electricity. Rates vary a lot, from a few pence per kWh up to higher rates on tariffs tied to a supplier's import tariff or battery. One widely available open tariff pays 12p per kWh at the time of writing, and some bundled tariffs pay more. Rates change often and sources disagree, so compare current offers on supplier sites. For systems up to 50kW you will need an MCS-certified system and installer. See the MCS certification guide.

Planning permission and permitted development

In England, solar panels on a house are generally permitted development, subject to conditions. Long-standing conditions included panels not protruding more than 200mm from the roof and not rising above the highest part of the roof, and extra limits in conservation areas. Listed buildings always need listed building consent.

The government amended the permitted development rules for domestic solar, with changes in force from 27 August 2026. They treat houses and blocks of flats separately, clarify plug-in solar and allow projects that would no longer qualify to use the old rules until 26 August 2027. Because the detail is new, read the current rules on the Planning Portal and check with your council. For listed buildings, see solar panels on listed buildings. Scotland, Wales and Northern Ireland have different rules.

Grid connection, electrical work and Building Regulations

Choosing an installer

See our solar PV installer page for what installers do and typical qualifications.

Sources and further reading

External links open in a new tab. Last checked October 2026.

Frequently asked questions

How much do solar panels cost in the UK in 2026?

A typical 4kWp system costs roughly 5,500 to 8,000 pounds installed, or about 1,400 to 2,000 pounds per kWp. Government and MCS median figures have been reported higher at about 7,500 pounds, so compare written quotes.

Do I need planning permission for solar panels?

Roof-mounted panels on a house in England are generally permitted development, subject to conditions, but the rules were amended from 27 August 2026. Listed buildings always need consent. Check the Planning Portal and your council.

What is the Smart Export Guarantee?

It is a scheme under which larger electricity suppliers pay you for surplus electricity you export. Rates vary by supplier, and systems up to 50kW generally need to be MCS certified.

Is a solar battery worth it?

It depends on how much of your power you use in the evening and whether you have a time-of-use tariff. Simple payback is often quoted at 10 years or more, so model it with your own usage.

Do I need to tell my network operator about solar panels?

Yes. Small systems are notified under G98 within 28 days of commissioning, and larger ones need approval under G99 first. Your installer normally handles this.

Next guide Heat Pumps Air and ground source: suitability, costs, running costs and grants. Read the guide

Related guides and tools

This page is general guidance for information only. Costs, grants, tariffs and planning rules change, and individual properties differ. Costs are indicative ranges drawn from industry and government sources, not quotes. Always get written quotes from MCS-certified installers and confirm current rules with your local planning authority, Ofgem and gov.uk.