Quantity Surveyor

A chartered professional who manages construction costs from initial budget through to final account - preparing estimates, bills of quantities, tender documents and valuations.

Costs from
£500
budget estimate
Home Building Professions Surveyors Quantity Surveyor

A quantity surveyor (QS) is a chartered professional who manages the financial and contractual aspects of construction projects. They are the cost experts of the building industry - producing budgets, preparing tender documents, valuing work in progress and settling final accounts. On larger projects they work alongside the architect and project manager as an independent check on contractor costs and a safeguard against budget overruns. In the UK, the primary qualification is MRICS (Member of the Royal Institution of Chartered Surveyors) through the quantity surveying pathway. A quantity surveyor may work for the employer (client-side) or for the contractor, but both roles require the same technical expertise.

  • Prepare initial cost plans and budget estimates from design information
  • Produce bills of quantities measuring all elements of construction work
  • Prepare tender documents and manage the competitive tender process
  • Analyse tenders received and make contractor appointment recommendations
  • Value work in progress and issue interim payment certificates
  • Assess and negotiate variations and contractor cost claims
  • Agree the final account with the contractor at practical completion
  • Advise on procurement routes, contract selection and risk allocation

A quantity surveyor adds most value on projects where costs are complex, competition for contractor work is important, or where disputes about money are likely. Below are the key trigger points.

Project budget over £100k
Cost planning and budget control become critical at this scale
Tendering to multiple contractors
Bills of quantities and a proper tender pack allow genuinely comparable quotes
Construction cost dispute
Contractor claiming for variations or extras - a QS can assess and negotiate
Final account dispute
Disagreement between client and contractor over the final amount due at completion
Development appraisal
Assessing the viability of a development before purchase or planning commitment
Insurance reinstatement valuation
Establishing the correct rebuild cost for commercial or complex residential properties
Employer's agent on design and build
Representing the client's commercial interests on a design and build contract
Value engineering exercise
Identifying where costs can be reduced without compromising quality or programme
Job typeTypical cost
Budget estimate / cost plan£500 - £1,500
Bills of quantities£1,500 - £5,000+
Tender analysis and report£600 - £1,500
Employer's agent fee% of contract value
Final account agreement£800 - £2,500
Hourly rate£80 - £150 / hr

QS fees on larger projects are often quoted as a percentage of construction cost - typically 1.5-3% for a full professional service. London rates are typically 20-30% higher. Always clarify whether the fee covers tender management, site valuations and final account.

MRICS - Quantity Surveying pathway (RICS)

The primary qualification for quantity surveyors in the UK. Requires a RICS-accredited degree in quantity surveying or a conversion route, plus the APC (Assessment of Professional Competence) covering cost management, procurement and contract administration. Verify at rics.org.

MCIOB - Chartered Institute of Building

Some quantity surveyors also hold CIOB membership, particularly those with a strong site and construction management background. MCIOB indicates competence in construction operations alongside cost management skills.

RICS APC - Assessment of Professional Competence

The structured training and assessment programme that leads to MRICS. Graduate quantity surveyors work through a structured logbook covering technical competencies including cost planning, procurement and contract practice, before sitting the final professional review.

Always confirm Professional Indemnity Insurance (PII) before appointing. RICS members must maintain PII as a condition of membership. A minimum of £500,000 per claim is standard for residential projects; commercial projects warrant £1m+.
RICS Firms directory - ricsfirms.com Search for RICS-regulated QS firms by location and specialism
What does a quantity surveyor actually do?

A quantity surveyor (QS) manages the financial and contractual side of a construction project. They prepare cost estimates and budgets, produce bills of quantities for tendering, evaluate tenders from contractors, value work in progress for payment certificates, negotiate and agree the final account, and advise on contract disputes and claims. On larger projects they work alongside the architect and project manager as part of the professional team.

Do I need a quantity surveyor for a house extension?

For small domestic extensions most homeowners manage costs without a QS, relying on builder quotes and an architect's approximate cost advice. However, if your project is over £100,000, involves tendering to multiple contractors, or you are concerned about cost control and final account settlement, a QS adds real value. They can prepare a proper specification and tender pack that allows like-for-like comparison of contractor quotes and identifies scope gaps before work starts.

What is the difference between a quantity surveyor and a project manager?

A quantity surveyor focuses specifically on financial and contractual management - costs, tenders, valuations and the final account. A project manager controls the overall delivery of the project - programme, quality, contractor coordination and client communication. On larger projects both are appointed; on smaller projects a building surveyor or project manager with cost management skills may combine both roles.