50+ Specialist Calculators
Instant Results - No Sign-Up
Free to Use
Professional tools for serious builders
Hands-on Trades
Hands-on Trades

Demolition Specialist

A contractor who safely demolishes or deconstructs buildings and structures - covering soft strip, structural demolition, asbestos removal and waste disposal to current health and safety legislation.

Costs from
£500
small outbuilding
Home Building Professions Hands-on Trades Demolition Specialist

A demolition specialist carries out the controlled removal of buildings, structures and internal elements safely and in compliance with health and safety law. On domestic projects the work ranges from removing a conservatory or garage to stripping out a kitchen or bathroom prior to refurbishment (soft strip). On larger projects it includes structural demolition of full buildings using excavators with specialist attachments. Any building constructed before 2000 must be surveyed for asbestos before demolition begins, and licensed asbestos removal must be completed first. NFDC (National Federation of Demolition Contractors) membership is the main quality mark.

  • Soft strip - removal of internal fixtures, fittings and finishes
  • Structural demolition of buildings and extensions
  • Asbestos survey co-ordination and licensed removal
  • Conservatory and outbuilding demolition
  • Chimney breast and stack removal
  • Wall removal (structural and non-structural)
  • Waste segregation, removal and legal disposal
  • Site clearance and preparation for new build

A demolition specialist is needed for any significant structural removal or site clearance. Always carry out an asbestos survey before appointing for work on pre-2000 buildings.

Conservatory removal
Demolishing an existing conservatory to make way for a new extension
Outbuilding or garage demolition
Removing a redundant garage, shed or outbuilding to clear a site or garden
Full house demolition
Complete structural demolition of an existing dwelling before new build
Soft strip before refurbishment
Removing all internal finishes, fixtures and services before a major refurbishment project
Chimney removal
Removing a chimney breast and stack, with temporary propping and structural engineer design
Commercial strip-out
Strip-out of a commercial or retail unit before new fit-out
Asbestos-containing building
Any pre-2000 building requiring asbestos survey and licensed removal before demolition
Site clearance
Clearing a brownfield or previously developed site of existing structures before new construction
Job typeTypical cost
Conservatory demolition and removal£1,000 - £3,000
Garage demolition (brick, single)£500 - £2,000
Full house demolition (3-bed semi)£8,000 - £20,000
Soft strip (per sq m)£15 - £40/sq m
Asbestos survey (domestic)£200 - £600
Licensed asbestos removal (per sq m)£50 - £150/sq m

Asbestos removal costs can vary significantly depending on the quantity and type (friable asbestos costs more to remove than bonded). Skips and waste disposal are usually included in demolition quotes but confirm this before signing.

NFDC - National Federation of Demolition Contractors

NFDC members are assessed for technical competence, health and safety management and environmental management. NFDC membership is the principal quality mark for demolition contractors. Find a member at demolition.co.uk.

HSE Licensed Asbestos Removal Contractor

Removal of licensable asbestos (including sprayed asbestos, asbestos insulation board and lagging) must be carried out by an HSE-licensed contractor. Verify the licence number at hse.gov.uk. Non-licensed asbestos (cement sheets, some floor tiles) can be removed by a trained and competent contractor.

CSCS Card

Demolition operatives are expected to hold a CSCS Demolition card. The Demolition card has specific health and safety requirements related to demolition work.

Always confirm that the contractor holds adequate Public Liability Insurance and can provide a waste carrier licence number before appointing - waste must be disposed of legally and the contractor is responsible for the waste transfer chain.
Do I need planning permission to demolish a building?

Demolition of most buildings in England requires prior approval from the Local Planning Authority under the Prior Notification procedure, even where permitted development rights apply. Full planning permission may be required for listed buildings, buildings in conservation areas and total demolition in certain locations. You must also notify the Health and Safety Executive (HSE) for demolition projects lasting more than 30 working days or involving more than 500 person-days. Always check with your Local Authority before starting.

How do I find out if a building has asbestos?

Buildings constructed before 2000 may contain asbestos in insulation boards, floor tiles, roof sheets, pipe lagging, textured coatings (Artex) and many other materials. Before any demolition or refurbishment, a licensed asbestos surveyor must carry out a Refurbishment and Demolition (R&D) survey to identify all asbestos-containing materials. Licensed asbestos removal must be completed before demolition work begins.

What is soft strip demolition?

Soft strip is the removal of all internal fixtures, fittings, services and non-structural elements before structural demolition begins. This includes removing floor and wall finishes, ceilings, partitions, kitchens, bathrooms, windows and mechanical and electrical services. Soft strip allows materials to be segregated and recycled, and ensures hazardous materials such as asbestos are identified and removed safely before the main demolition.