Demolition Contractor

A specialist contractor who carries out safe, controlled demolition of buildings and structures - from selective internal strip-out to full site clearance and asbestos-containing structure removal.

Costs from
£800
internal strip-out
Home Building Professions Hands-On Trades Demolition Contractor

A demolition contractor specialises in the safe, planned removal of buildings and structures - from selective internal strip-outs prior to renovation to complete site clearance for new development. Demolition is a highly regulated activity: contractors must hold appropriate qualifications, carry out pre-demolition surveys (including asbestos surveys), comply with HSE CDM Regulations and notify Building Control before structural demolition begins. The National Federation of Demolition Contractors (NFDC) is the primary trade body and a reliable quality indicator.

  • Conduct pre-demolition surveys and produce a method statement
  • Carry out internal strip-out - removing fixtures, fittings and non-structural elements
  • Selective structural demolition - chimney breasts, internal walls, outbuildings
  • Full building demolition to ground level
  • Coordinate asbestos surveys and HSE-licensed asbestos removal before demolition
  • Sort and segregate demolition waste for recycling and disposal
  • Arrange skip hire, grab lorries and bulker wagons for waste removal
  • Prepare and level sites following demolition
  • Notify HSE and Building Control as required by legislation
  • Manage dust, noise and traffic impacts during works

Any structural demolition - whether a chimney breast removal or full site clearance - requires a specialist contractor, not a general labourer.

Site clearance before new development
Selective demolition for extension
Internal strip-out before renovation
Chimney breast removal
Asbestos structure removal
Outbuilding or garage demolition
Job typeTypical cost
Internal strip-out (per day)£800 - £1,500
Garage or outbuilding demolition£1,500 - £5,000
Full house demolition£8,000 - £25,000+
Chimney breast removal£1,000 - £3,000
Asbestos survey before demolition (required)£300 - £600
Skip hire£200 - £400 each

Asbestos removal costs vary enormously depending on the type, quantity and accessibility of asbestos-containing materials found. Always commission the survey before agreeing a fixed demolition price.

NDTG Card (National Demolition Training Group)

The demolition-specific skills card recognised across the industry. Operatives hold cards at different levels depending on their role and competence.

CCDO - Certificate of Competence in Demolition Operations

The senior operatives and supervisors qualification awarded by the NDTG, covering safe systems of work and method statement compliance.

NFDC Member (National Federation of Demolition Contractors)

Membership of NFDC is the primary quality indicator. NFDC members must demonstrate financial stability, appropriate insurance and management competence. Find members at nfdc.com.

HSE Licensed Asbestos Contractor (where required)

For licensed asbestos removal - which covers the most hazardous forms including sprayed coatings and lagging - a separate HSE-licensed contractor must be used. Check licences at hse.gov.uk.

Always ask for evidence of Professional Indemnity Insurance (PII) and Public Liability Insurance before appointing. A minimum of £5 million public liability cover is typical for demolition contractors.
Is there a difference between a demolition contractor and a skip hire company?

Yes - a demolition contractor carries out the work safely, manages waste streams and holds the required licences for hazardous materials; a skip hire company only provides containers for waste. For any structural demolition or strip-out involving potential asbestos or structural risk, always use a specialist NFDC member.

Do I need planning permission for demolition?

Demolition of a home or any building in a conservation area requires prior notification to and agreement from the local planning authority before works begin. This is done via a Prior Approval application. In most other cases demolition does not require full planning permission, but Building Control must be notified before any structural demolition starts.

Who handles asbestos in demolition?

An asbestos survey (type 2 or type 3 refurbishment and demolition survey) must be completed before any demolition work begins. If asbestos-containing materials are found, a HSE-licensed asbestos removal contractor must remove them before demolition proceeds. This is a legal requirement under the Control of Asbestos Regulations 2012.